Thursday, January 1, 2009

Main Cabin Deconstruction - Port

And the disassembling begins...

The port side of the main cabin has been stripped of all joinery. The upper ceiling was in poor condition due to rain water entering opened port hole, on and off for 16 years+. Good for patterns though. Below the bilge stringer, mahogany ceiling in near perfect condition. Water no doubt was impeded by the bilge stringer and continued down inside of hull instead.

What is totally inspiring is the condition of the planking. No visible sign of any aging. In the daylight, only a few seams have a tad of visible light.

Doing my best with documenting. My present scheme is taking notes, drawing pictures where necessary, bundling up pieces by taping together, writing on back of pieces, collecting fasteners in ziploc bags with notes and eventually storing on its separate shelf to be reassembled when the structure is all restored. And pictures ... These were taken with my iPhone. Decent quality though I have better cameras.










No comments: